background

Disaster Recovery Consultancy

Disaster Recovery Consultancy

Critical systems / services should be determined in accordance with the business needs and priorities of the institutions. In case of any disaster, how much interruption in them can be tolerated, etc. As a result of the analyzes, disaster recovery analyzes, actions to be taken during disaster, processes to be followed, roles and responsibilities should be defined.

chart
Disaster Recovery Systems

Disaster Recovery Systems are created in a Geographically Remote Location to the Main Systems.

Resources in FKM are not obliged to be one to one.

Commissioning of the System Is Not Automatic, It Is Dependent On A Procedure.

Usually Works in Active-Passive Architecture.

RTO And RPO Times Varies By Solution.


Takes Precautions Against All Scenarios That Will Prevent Service From Main Systems.

What do you get with Treo Disaster Recovery Consultancy Service?

International Standards

Disaster recovery consultancy includes process design consultancy in accordance with ISO 27001, ISO 27031 and ISO 22301 standards in order to ensure the continuity of the works carried out in line with the strategic goals of the institutions and to define the guides / processes to be followed in case of any disaster.

Interruption Tolerance

Within the scope of disaster recovery consultancy, critical systems / services are determined in accordance with the business needs and priorities of the institutions, and an analysis of how much the systems tolerate an interruption in case of any business interruption is made. According to the results of this analysis, actions to be taken at the time of business interruption, processes to be followed, roles and responsibilities are defined.

Disaster Recovery Guide

The policies, procedures and processes formed are guides in ensuring the continuity of the critical systems of the institutions. In the event of any business interruption, he / she determines how the operations related to the critical systems will be continued without interruption and / or minimum interruption. At the same time, corporate level management suggestions on how to ensure the continuity of the work done by the business units, how to ensure business interruption and how to carry out the tests are also presented to the institutions within the scope of consultancy.